Site Work by M.T. Mayo Corp.

McCall Middle School Winchester, MA

McCall Middle School Phase II Addition, Winchester, MA

Duration: April 2019 to August 2020

This was a prevailing wage project regarding a classroom & cafeteria addition at  the McCall Middle School in Winchester, MA.

Project scope:

  • Site Preparation & Demolition (Erosion control, Temporary Roadway, demolition of existing concrete retaining wall and stairs)
  • Earthwork (Excavate for building foundations, Excavate and backfill under slab plumbing, subbase and base courses for slabs and roadways)
  • Utilities (R&D existing underground utilities, install drainage piping and structures.
  • Install new infiltration basin, provide new sewer piping and structures, provide 4 new precast light pole bases and associated trenching for new conduit.
Mailing Address

M.T. Mayo Corp.
P.O. Box 3054
Woburn, MA 01888

Corporate Office

M.T. Mayo Corp.
155 New Boston St Suite 166
Woburn, MA 01801

Shop

M.T. Mayo Corp.
71 Alexander Rd.
Billerica, MA 01821

Stay Connected