Project Description: Complete Drainage & Site Work at the 57 Mill Street Apartments – Woburn, MA
M.T. Mayo Corp. has been contracted to perform comprehensive drainage and site work at 57 Mill St Apartments in Woburn, MA. This project is a crucial step in the development of the residential complex, ensuring proper water management, site stability, and preparation for future construction phases.
Scope of Work:
Stormwater Drainage System Installation:
Excavation and installation of an advanced stormwater management system.
Placement of catch basins, drainpipes, and infiltration systems to prevent flooding and water pooling.
Integration with municipal drainage infrastructure for efficient runoff management.
Site Preparation & Earthwork:
Clearing and grading of the site to establish a stable foundation.
Excavation and backfilling to support building foundations and roadways.
Soil compaction and erosion control measures to ensure long-term site integrity.
Coordination with local utility companies for seamless installation.
Implementation of all required environmental and safety protocols.
Compliance with City of Woburn and Middlesex County construction regulations.
Final Grading & Surface Preparation:
Installation of sub-base material for roadways, walkways, and parking areas.
Site stabilization, landscaping preparation, and erosion control measures.
M.T. Mayo Corp. is dedicated to delivering high-quality site development solutions that meet the needs of both 57 Mill St Apartments and the City of Woburn. Our team’s expertise ensures a safe, efficient, and sustainable project that lays the groundwork for a successful residential community.